| Location: | Lot 8-9 Axis Place Larapinta QLD |
|---|---|
| Construction Period | April 2015 to Feb 2016 |
| Location: | Lot 8-9 Axis Place Larapinta QLD |
|---|---|
| Construction Period | April 2015 to Feb 2016 |
The new Vawdrey facility boasts an impressive 30 bay drive through area, chassis straightening jigs, fibreglass repair bay, drive through spray paint booth, trailer wash bay, two 5-tonne overhead gantry cranes and expanded fabrication facilities.
A sophisticated storm water management system for run off water into environmental pods was developed for this project given the weather conditions to alleviate water aquaplane.