Spraying Systems
Location: 8 Moorina Way, Truganina VIC
Land Size: 6500m2
Warehouse: 2765m2
Office: 700m2
Laboratory: 150m2
Construction Period (Stage 1): February 2018- August 2018
Construction Period (Stage 2): September 2018- March 2019

The Spraying Systems facility is built on a 6500m2 site in Truganina comprising a warehouse of 2765m2, and an adjoining office of 700m2. The exterior of the building features a combination of precast concrete panels, glazing, and compressed cement sheet. The warehouse fitout also contains a class 7 laboratory 150m2, fully airconditioned and pressurised minimising the ingress of dust to the system. 

The project was built in stages, the warehouse and office stage 1 and the laboratory as a second stage.